Joint project: Inselnetz_optimal - Integration of the highest possible share of renewable energy in island grids; sub-project: Plant and system stability
| Led by: | Prof. Dr.-Ing. Axel Mertens |
| Team: | Marc Dokus, M. Sc., Robin Strunk, M. Sc. |
| Year: | 2021 |
| Funding: | BMWi |
| Duration: | 01.09.2021 – 31.08.2024 |